Reducing time on task: how it fell by 80 to 90 % in steam-turbine manufacturing
Time on task drops when you observe a frequent task at the workplace, measure how long it takes today and then remove the searching, retyping and copying from the workflow. In steam-turbine manufacturing at Siemens, that is what led to 80 to 90 % less time on task, according to the project records.
Time on task is the time a person needs for a clearly defined task, from the start to the finished result. In specialist software it is often the most honest metric there is. It shows how much working time an interface costs, every day, for every person who uses it.
This post covers how to measure time on task, where specialist software loses time and what made the difference in a real case from manufacturing.
How do you measure time on task?
You need a task that happens often and has a clear end. For example: creating a routing for a new part, checking and approving a report, entering an order. Then you measure how long people from the team need for it, under normal conditions and with real data.
- Same task, same starting point: otherwise you compare two different things.
- Several people, not only the fastest: new colleagues show where the interface explains nothing.
- Write down errors and abandoned attempts: a fast task with many corrections is not fast.
This first measurement is your baseline. Without it, every later improvement stays a claim. How we set up metrics like this in projects is described on the UX strategy page.
Where does specialist software lose time?
Rarely in the clicking itself. The time usually sits in the steps around it: looking up information in another system, retyping values from paper or PDFs, copying and adapting texts from old cases, asking colleagues because the interface does not show a rule.
None of these steps appear in a requirements list. People are used to them and do not mention them in a workshop. They only become visible when someone sits next to them and watches. That is why every project of ours starts with UX research at the workplace.
What happened in steam-turbine manufacturing?

In a Siemens steam-turbine factory in Brazil, industrial engineers create the manufacturing processes, called routings in SAP. The way there ran through printed bills of materials, highlighter pens and copying old SAP texts from earlier projects. Thiago Andrade, now founder of Beabstracto, was employed there as an application engineer at the time and worked through this process himself for months.
Only then did the team name the core problems and confirm them together. The solution had three parts: a searchable interface instead of paper lists, a template library instead of copy and paste, and automation that moves data from Excel into SAP. According to the project records, time on task then fell by 80 to 90 %. You can read the full story in the Siemens case.
How do you approach this in your own system?
- Pick a task that happens often and costs many people time.
- Watch before you change anything: where do people search, retype, copy or ask?
- Measure today's time and count the errors.
- Tackle the biggest block of searching or retyping first, not the visuals.
- Measure again with the same task and the same method.
The last step matters most. Only if before and after are measured the same way do you know whether the work changed or just the screen.
What should you watch out for?
Time on task alone can mislead. An interface that is faster but produces more errors only moves the work further down the line. So always measure whether the task was done correctly as well. In industry, where a wrong routing on the shop floor gets expensive, this matters even more. More on our UX for industry page.
Frequently asked questions
- What does time on task mean?
- Time on task is the time a person needs for a clearly defined task, from the start to the finished result. It is usually measured in usability tests or while observing people at their workplace.
- How do you measure time on task properly?
- With a frequent task, the same starting point and several people from the team. Errors and abandoned attempts are recorded. The first measurement is the baseline, and the second one after the change runs exactly the same way.
- How much can time on task be reduced?
- That depends on how much searching, retyping and copying the task contains today. In steam-turbine manufacturing at Siemens it fell by 80 to 90 %, according to the project records. A promise for your system only makes sense after measuring it.
- Is it enough to look at time alone?
- No. Count errors and corrections as well. A faster interface that produces more errors only moves the work somewhere else.